Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670408

- Product Categories
- Friendly Links
Information Name: | Crack paste manufacturers, Shanxi crack stickers, Rui Bridge St. |
Published: | 2015-03-20 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Reinforced the role of the mechanism of crack crack stickers affixed to the surface of high-strength fabric with a large high-temperature tensile strength, can effectively resist interlaminar tensile stress cracks, the crack width limit development, played a role reinforced crack paste price, improved tensile strength pavement partial structure layer of asphalt. Impermeable impermeable paved role in the crack surface crack paste between layers, forming a complete impermeable barrier layer, can cut off the path of rain and snow water infiltration, reducing pavement water damage. Black and white change crack paste special 25kn change black white, road construction terms, is the original cement concrete pavement (gray) converted into asphalt concrete pavement (black), arrives environmental protection, dust, noise and increase driving comfort effect. With respect to the original concrete pavement, between black and white change after the road surface and the tire adhesion enhancement, vehicle braking performance in dealing with emergencies greatly improve road crack stickers, vehicle manufacturers posted crack up more peaceful, more stable ; vehicle noise generated in the process will be greatly reduced in order to reduce urban noise plays an important role; black asphalt pavement crack paste vacuuming function better, can effectively absorb the vehicle in the process of dust, which can improve both the street shop, resident quality residential environment, improve the quality of the urban environment beautification black white change program in general, there are four primary repair roads and set up a stress-absorbing layer 2 of the old gravel paving asphalt pavement surface layer 3 after excavation old New Compound 4 old road pavement excavation new asphalt concrete pavement above methods in the construction process of the time-consuming work of high cost of environmental pollution produced grassroots crack Big companies posted in the construction process to avoid more harm as long as the original cement pavement cleaned posted by grassroots crack at the seams and cracks of the original pavement can be pasted directly into the original pavement for a new road base paste factory with crack, crack Shanxi stickers, Bridge St. Rui Rui provided by Xinxiang City, St. Bridge Maintenance Technology Co., Ltd. . Xinxiang City of St. Rui Bridge Maintenance Technology Co., Ltd. (www.srklt.com) strong, credible, in Xinxiang asphalt industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Swiss Bridge St. and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 19706 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City of St. Rui Bridge Maintenance Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19706 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City of St. Rui Bridge Maintenance Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility